INSTALLATION INSTRUCTIONS
60
Primary heat exchanger
(see fig. 1)
Close the shut-off valves and drain the central
heating circuit of the boiler;
Switch off the power and gas supply to the boiler;
Remove and dismantle the entire burner unit
(see
“Cleaning the condensation module and burner
unit”);
Remove the gas valve;
Remove the spring and then the condensate
drainpipe;
Remove the fixing springs and then the delivery and
return pipes;
Remove the support brackets and pull out the heat
exchanger;
Remove the regulation sensor from the old heat
exchanger and refit it together with the two
condensate drainpipes to the new one;
Replace the heat exchanger and re-assemble the
components following the above procedure in reverse
order;
Switch on the electricity, water and gas supplies and
fill the system with water. Check for any leaks from
the joints and bleed off any air from the circuit.
Restart the boiler, making sure that there are no gas
leaks;
Expansion vessel
(see fig. 2)
Close the shut-off valves and drain the central
heating circuit of the boiler.
Use a
19 mm
spanner to unscrew the pipe coupling
to the vessel.
Unscrew the fixing screws and remove the upper
mounting bracket. Remove the expansion vessel
from the left side of the boiler.
Replace the expansion vessel and re-assemble the
components following the above procedure in reverse
order.
Switch on the electricity, water and gas supplies and
fill the system with water. Check for any leaks from
the joints and bleed off any air from the circuit;
fixing bracket
expansion vessel
Fig. 2
primary
heat
exchanger
flue
connection
chamber
stainless steel
pipe
coil
ceramic fibre
washer
Fig. 1
Содержание PCC 34-H
Страница 8: ...GENERAL INFORMATION 5 ...
Страница 9: ...GENERALInformation 6 ING ...
Страница 10: ...GENERALInformation 7 ...
Страница 11: ...GENERALInformation 8 ...
Страница 32: ...INSTALLATION INSTRUCTIONS 29 Venting Pictures Illustrations ...
Страница 33: ...INSTALLATION INSTRUCTIONS 30 Included With Each Combination Boiler Is A PAHVK Horizontal Kit ...
Страница 37: ...INSTALLATION INSTRUCTIONS 34 ...
Страница 38: ...INSTALLATION INSTRUCTIONS 35 ...
Страница 67: ...INSTALLATION INSTRUCTIONS 64 INDIRECT FIRED WATER HEATER 6 9 D H W sensor connection ...
Страница 71: ...68 6 13 Cycle Sequence of Operations ...
Страница 72: ...69 Pensotti LLC 34 Coffin Ave Brewer ME 04412 P 207 942 3636 F 207 942 3737 www pensottiboiler com ...