PB-1525 Wood Pellet Burner System: Installation and Operation Manual
Rev 1.0, OCTOBER 2011
Page 24 of 67
(Typically labeled B1 and B2) typically switch 120V AC when there is
a call for the burner to fire. Connecting the WHT/BLK and WHT/YEL
leads of the RIB to the aquastat and the BLU and ORG leads of the
RIB to the Pellergy PB-1525 thermostat input will result in proper
operation.
Figure 2.8: RIBU1C Schematic Detail
WARNING!
The PB-1525 shall be connected using one power source
only.
The power source for the PB-1525 must be provided
through the existing boiler/furnace safety interlock
features.