5
OnSite 2800 Series User Manual
Table of Contents
Installing the T1/E1 twisted pair cables
..............................................................................................34
Installing the E1 dual coaxial cables
....................................................................................................35
Connecting to external power source
.........................................................................................................36
3
Getting started with the OnSite Managed VPN Router
................................................................................ 38
Introduction
..........................................................................................................................................................39
1. Configure IP address
.........................................................................................................................................40
Power connection and default configuration
...................................................................................................40
Connect with the serial interface
.....................................................................................................................40
Login
..............................................................................................................................................................41
Changing the IP address
.................................................................................................................................41
2. Connect the OnSite VPN Router to the network
..............................................................................................42
3. Load configuration
............................................................................................................................................42
4
Serial port configuration
............................................................................................................................... 44
Introduction
..........................................................................................................................................................45
Serial port configuration task list
...........................................................................................................................45
Disabling an interface
.....................................................................................................................................45
Enabling an interface
......................................................................................................................................46
Configuring the encapsulation for Frame Relay
..............................................................................................47
Enter Frame Relay mode
.................................................................................................................................48
Configuring the LMI type
...............................................................................................................................48
Configuring the keep-alive interval
.................................................................................................................49
Entering Frame Relay PVC configuration mode
.............................................................................................49
Configuring the PVC encapsulation type
........................................................................................................50
Binding the Frame Relay PVC to IP interface
.................................................................................................50
Enabling a Frame Relay PVC
..........................................................................................................................52
Disabling a Frame Relay PVC
.........................................................................................................................52
Displaying serial port information
...................................................................................................................53
Displaying Frame Relay information
...............................................................................................................54
Integrated service access
..................................................................................................................................55
5
T1/E1 port configuration
.............................................................................................................................. 58
Introduction
..........................................................................................................................................................59
T1/E1 port configuration task list
..........................................................................................................................59
Enable/Disable T1/E1 port
.............................................................................................................................59
Configuring T1/E1 port-type
..........................................................................................................................60
Configuring T1/E1 clock-mode
......................................................................................................................60
Configuring T1/E1 line-code
..........................................................................................................................60
Configuring T1/E1 framing
............................................................................................................................61
Configuring T1/E1 line-build-out (T1 only)
..................................................................................................61
Configuring T1/E1 used-connector (E1 only)
.................................................................................................61
Configuring T1/E1 application mode
.............................................................................................................62
Configuring T1/E1 LOS threshold
.................................................................................................................62
Configuring T1/E1 encapsulation
...................................................................................................................62
Create a Channel-Group
.................................................................................................................................62
Содержание OnSite 2800 Series
Страница 112: ...112 Chapter 9 LEDs status and monitoring Chapter contents Status LEDs 113...
Страница 124: ...124 Appendix C Cabling Chapter contents Introduction 125 Serial console 125 Ethernet 10Base T and 100Base T 126...
Страница 132: ...132 Appendix E OnSite 2800 Series factory configuration Chapter contents Introduction 133...
Страница 134: ...134 Appendix F Installation checklist Chapter contents Introduction 135...