![background image](http://html1.mh-extra.com/html/patton-electronics/onsite-2800-series/onsite-2800-series_user-manual_4085019035.webp)
Installing the VPN router
35
OnSite 2800 Series User Manual
2 • Hardware installation
Note
Pins not listed are not used.
Installing the E1 dual coaxial cables.
If the PBX or switch connection provides dual coaxial cables for the E1
connection, the transmit cable from the PBX/switch connects to the RX coaxial connector. Similarly, the
receive cable from the PBX/switch connects to the TX coaxial connector.
Figure 6. Rear panel of 2803K/UI
Hazardous network voltages are present in the PRI cables. If you detach the
cable, detach the end away from the OnSite first to avoid possible electric
shock. Network hazardous voltages may be present on the device in the area
of the PRI port, regardless of power being on or off.
To prevent damage to the system, make certain you connect the
PRI cable to the PRI port only and not to any other RJ type recep-
tacle.
Hazardous network voltages are present in the PRI cables. If you detach the
cable, detach the end away from the OnSite first to avoid possible electric
shock. Network hazardous voltages may be present on the device in the area
of the PRI port, regardless of power being on or off.
To prevent damage to the system, make certain you connect the
PRI cable to the PRI port only and not to any other RJ type recep-
tacle.
WARNING
CAUTION
WARNING
CAUTION
Содержание OnSite 2800 Series
Страница 112: ...112 Chapter 9 LEDs status and monitoring Chapter contents Status LEDs 113...
Страница 124: ...124 Appendix C Cabling Chapter contents Introduction 125 Serial console 125 Ethernet 10Base T and 100Base T 126...
Страница 132: ...132 Appendix E OnSite 2800 Series factory configuration Chapter contents Introduction 133...
Страница 134: ...134 Appendix F Installation checklist Chapter contents Introduction 135...