Introduction
135
OnSite 2800 Series User Manual
F • Installation checklist
Introduction
This appendix lists the tasks for installing an OnSite 2800 Series Managed VPN Router (see
table 19
). Make a
copy of this checklist and mark the entries as you complete each task. For each OnSite 2800 Series Router,
include a copy of the completed checklist in your site log.
Table 19. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
OnSite release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Содержание OnSite 2800 Series
Страница 112: ...112 Chapter 9 LEDs status and monitoring Chapter contents Status LEDs 113...
Страница 124: ...124 Appendix C Cabling Chapter contents Introduction 125 Serial console 125 Ethernet 10Base T and 100Base T 126...
Страница 132: ...132 Appendix E OnSite 2800 Series factory configuration Chapter contents Introduction 133...
Страница 134: ...134 Appendix F Installation checklist Chapter contents Introduction 135...