Appendix A. Installation Requirements
A-108
BitStorm 1900 Installation and Maintenance Guide
1900-A2-GN20-00
•
The bay must be installed and secured in accordance with standard
telecommunications industry practices
•
Use an Isolation Kit to isolate the bay from building structures and
outside elements for "in-building" installations (i.e., enterprise,
MDU, and MTU).
•
The bay must be electrically grounded according to standard
telecommunications industry practices
BS1900 System Specifications
Table A-1, "BitStorm 1900 System Specifications" shows the power
specifications for the BitStorm 1900 shelf.
Table A-1: BitStorm 1900 System Specifications
BitStorm 1900 System Specifications
Description
Front Mount
10306
Full
1
Front Mount
10224 Full
2
Lines Per Chassis
60 Lines, 10 Megabit
240 Lines, 10 Megabit
Weight
50 lbs.
46 lbs.
Height
12.1875”
12.1875”
Width
12”
12”
Required Rack Units
13
13
Depth
12”
12”
Cabled Depth
17.5”
17.5”
Cabled Ear to Front (Front Mount)
4”
4”
Cabled Ear to Front (Mid Mount)
7.75”
7.75”
Cabled Ear to Back (Mid Mount)
13.5”
13.5”
Cabled Ear to Back (Mid Mount)
9.75”
9.75”
Humidity (Non-Condensing)
1% to 90%
1% to 90%
Ambient Temp. Rating
5
o
C to 40
o
C
5
o
C to 40
o
C
Altitude
-200 to 13,123’
-200 to 13,123’
Содержание BitStorm IP DSLAM 1900
Страница 1: ...BitStorm 1900 IP DSLAM Installation and Maintenance Guide Document No 1900 A2 GN20 00 July 2002...
Страница 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 148: ...Appendix B Cabling Specifications B 132 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...