2. BitStorm 1900 Installation and Testing
2-64
BitStorm 1900 Installation and Maintenance Guide
1900-A2-GN20-00
Task 009: Installing Voice/Data w/Filter 66-Block
Connections
Use this procedure to connect the BitStorm 1900 to the EtherLoop
cross-connect in applications where voice/data service is required with
a Filter 66-Block.
Requirements
This procedure requires the following tools and materials:
•
5 BitStorm 1900 cable harnesses
•
5 intermediate cables
•
Cross-connect block(s) of the same type used in the existing main
distribution frame (MDF)
•
Cross-connect punch-down tool
•
Jumper Wire (24 AWG)
"Appendix B. Cabling Specifications," on page 115 contains the
complete specifications for the cables and wiring required in this
procedure.
Step
Procedure
1.)
Mount 66-blocks on wall in an appropriate area for running
jumpers.
2.)
Verify the room position on frame blocks.
3.)
Replace jumpers to 66-Filter Block and retest phone lines.
4.)
Refer to Figure 2-14, "Voice/Data Filter 66-Block Connections for
10306 CO Modems," on page 65, and Figure 2-15, "Voice/Data
Filter 66-Block Connections for 10224 CO Modems," on page 66.
Содержание BitStorm IP DSLAM 1900
Страница 1: ...BitStorm 1900 IP DSLAM Installation and Maintenance Guide Document No 1900 A2 GN20 00 July 2002...
Страница 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 148: ...Appendix B Cabling Specifications B 132 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...