Appendix A. Installation Requirements
A-112
BitStorm 1900 Installation and Maintenance Guide
1900-A2-GN20-00
Installation Tools and Materials
The tools and materials required to install the BitStorm 1900 shelf
include the following:
•
4 bay mounting screws
•
1 medium Phillips-head screwdriver
•
1 cross-connect block matching the existing blocks used in the
facility MDF, such as Siemon R66, BIX, or AT&T 110 cross-
connect blocks
•
1 wiring punch-down tool intended for use with the cross-connect
block
•
Cross-connect jumper wires (24 AWG, quantity varies) for tip/ring
connections
01-30036-01
Filter Card, 3RU
12 filters;
1 filter card per two 10306 cards
2 filter cards per 10224
04-00007-10
Champ to Dual Omni
Grid
2 per four 10306 cards
2 per 10224
04-00008-18
Omni Grid to Dual Omni
Grid
2 per 10224 w/filter shelf
04-00028-01
Omni Grid to Dual Omni
Grid
1 per two 10306 cards with filter shelf
03-00003-01
Air Baffle
1 per BitStorm 1900
01-00085-01
Bulk Pack 5 Fan Tray
Filters
Replace every 6 months
(Required DC fan tray for NEBs
compliance)
DO NOT install a filter in an AC fan tray
– only the filter frame.
01-00084-01
DC Fan Tray
1 per BitStorm 1900 w/MIU
(An air filter must be installed to meet
NEBs)
01-00084-02
AC Fan Tray
1 per BitStorm 1900 w/MIU
(DO NOT install an air filter – only the
air filter frame.)
Table A-2: BitStorm 1900 Components (continued)
Part#
BitStorm Component
Rules/Capacity
Содержание BitStorm IP DSLAM 1900
Страница 1: ...BitStorm 1900 IP DSLAM Installation and Maintenance Guide Document No 1900 A2 GN20 00 July 2002...
Страница 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Страница 148: ...Appendix B Cabling Specifications B 132 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...