8
201627 REV X
4 RU SSPA Chassis Operations Manual
Figure 7-5: Header Sub-Packet .................................................................................................. 82
Figure 7-6: Data Sub-Packet ....................................................................................................... 83
Figure 7-7: Trailer Sub-Packet .................................................................................................... 86
Figure 7-8: Packet Wrapper technique ....................................................................................... 87
Figure 7-9: Terminal Mode Session Example ............................................................................. 97
Figure 7-10: UDP Redirect Frame Example ............................................................................... 99
Figure 7-11: Initializing Web Interface ....................................................................................... 101
Figure 7-12: GetIF Application Parameters Tab ....................................................................... 112
Figure 7-13: Getif MBrowser window, with update data in output data box .............................. 112
Figure 7-14: Getif MBrowser window, setting settingValue.5 to '1' ........................................... 113
Figure A-1: TCP/IP Properties Window ..................................................................................... 115
Figure B-1: Modular Plug Crimping Tool ................................................................................... 119
Figure B-2: Transmission Line .................................................................................................. 119
Figure B-3: Ethernet Cable Pin-Outs ........................................................................................ 120
Figure B-4: Ethernet Wire Color Code Standards ..................................................................... 121
Figure B-5: Wiring Using 568A Color Codes ............................................................................. 121
Figure B-6: Wiring Using 568A and 568B Color Codes ............................................................ 121
Figure C-1: New Rack Mount SSPA Dialog Window ................................................................ 123
Figure C-2: SSPA Status Window ............................................................................................. 124
Figure C-3: SSPA Faults Window ............................................................................................. 124
Figure C-4: SSPA Settings Window .......................................................................................... 125
Figure C-5: IP Setup Window .................................................................................................... 125
Tables
Table 2-1: Switch Port (J3) pin outs ............................................................................................ 21
Table 2-2: Serial Main (J4) pin outs ............................................................................................ 22
Table 2-3: Parallel connector (37 socket D connector) ............................................................... 23
Table 2-4: Ethernet Port (J9) pin outs ......................................................................................... 24
Table 4-1: RF Switch Connector Wiring ...................................................................................... 60
Table 4-2: Link Port (J8) Pin Outs ............................................................................................... 60
Table 4-3: Parallel Connector, Highlighting 1:1 Functions .......................................................... 64
Table 5-1: RF Switch Connector Wiring ...................................................................................... 67
Table 5-2: Link Cable Wiring ....................................................................................................... 68
Table 6-1: ZBUC Frequency Specifications ................................................................................ 75
Table 6-2: ZBUC RF Output Phase Noise Specification ............................................................. 75
Table 6-3: Common Coaxial Cable Characteristics .................................................................... 77
Table 7-1: Command Byte Values .............................................................................................. 83
Table 7-2: Data Tag Byte Values ................................................................................................ 84
Table 7-3: Error Status Byte Values ............................................................................................ 85
Table 7-4: Request Frame Structure ........................................................................................... 88
Table 7-5: Response Frame Structure ........................................................................................ 88
Table 7-6: System Setting Details ............................................................................................... 89
Table 7-7: System Threshold Addressing Details (Read Only) .................................................. 91
Table 7-8: System Conditions Addressing Details ...................................................................... 92
Table 7-9: ADC Data Addressing Details .................................................................................... 93
Table 7-10: OSI Model for RM SSPA Ethernet IP Interface ....................................................... 99
Table 7-11: Detailed Settings .................................................................................................... 107
Table 7-12: Detailed Thresholds ............................................................................................... 109
Table 7-13: Detailed Conditions ................................................................................................ 110
Содержание 4 RU Chassis
Страница 14: ...14 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 46: ...46 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 78: ...78 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 114: ...114 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 118: ...118 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 126: ...126 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 130: ...130 201627 REV X 4 RU SSPA Chassis Operations Manual THIS PAGE LEFT INTENTIONALLY BLANK ...