INTELLIGENT GATEWAY INSTALLATION MANUAL
7
Getting Started
Before entering the facility to install and configure the Gateway devices, ensure the
completion of the following preparatory steps.
1.
2.
Unpack Gateway kit
(s) from boxes. Count and verify quantities. At least two Gateways are required
for redundancy. Ensure that each Gateway has the approved 5VDC power supply.
3.
Verify that
one 110VAC to 220VAC NEMA5 or C14 power outlet
is available within a few feet of the
intended Gateway installation location.
4.
Verify that the data center operator has provided for network connectivity by either:
a)
One static IP address and two open ports for each Gateway to be installed (configuration uses
port 80, data uses port 10001), or
b)
Active DHCP Host name and Domain name and two open ports for each Gateway.
Installation and testing cannot begin without these address and port
assignments.
Two ports per Gateway IP address must be open:
Port 80 = Configuration via the Gateway’s web page.
Port 10001 = Data received from SynapSense wireless sensors.
5.
When adding a gateway to an existing wireless network, verify that your nodes have
SynapSense
firmware version 29.4 or higher, software version 6.7 or higher
, and applicable documentation.
6.
Verify there is only ONE Device Manager per installation. This can be:
a) Device Manager running on one Gateway but not on any other Gateway or the
server, or
b) Device Manager running only on the Environment Server machine but not on any
of the Gateways.
7.
Verify that the install team has all of the
Kit Components
The SynapSense Intelligent Gateway kit includes:
•
One (1) Gateway module with jacks for Ethernet and external power
Содержание Synapsense
Страница 1: ...Intelligent Gateway Installation Manual...