EN9
Names of the Parts and Steps to Take Before Operation
Outlet pipe
(length: approx. 45 cm)
Control panel
(P. EN30)
LCD display
Main unit
Water supply hose
(length: approx. 90 cm)
Faucet
(not included)
Hose strap
Bypass
selector
Drain outlet
Acidic water and drain hoses
(length: approx. 60 cm)
Suction
disc
Water quality selector
buttons
(P. EN20)
Power plug
Power cord
(length: approx. 3 m)
Acidic water stand
(with drain outlet)
Acidic water spout
Acidic water will come out while the Alkaline Ionizer is producing
alkaline ion water. (Use it to wash dishes, vegetables, etc.)
Main spout
Engli
sh
1
Checking the faucet
(P. EN8)
2
Attaching the bypass selector
(P. EN10 ~ EN12)
3
Installing the Alkaline Ionizer and
plug in.
(P. EN13 ~ EN15)
4
Check after installation
(P. EN16)
Run alkaline ion water through the
Alkaline Ionizer for about 3 to 4 minutes
to expel the air inside the main unit.
“Preparation time” blinks for about 20
seconds on the LCD display.
Steps to take before operation
5
Measuring the pH level
(ion concentration)
(P. EN17)
6
Selecting the language of the LCD
displays
(P. EN19)
Operation
(P. EN20 ~ EN22)
TK-AS66-ZEX̲En.indb 9
TK-AS66-ZEX̲En.indb 9
2017/01/30 15:04:12
2017/01/30 15:04:12