![Panasonic MDF-DU502VH Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/panasonic/mdf-du502vh/mdf-du502vh_service-manual_267963048.webp)
3.2
Evacuation
①
Procedure
:
Remove the hose of the general purpose GM (or coolant
port) that was connected from the nitrogen cylinder, open the
nitrogen, shut the valve (or VR) of the removed hose, and
perform vacuum evacuation to fill the refrigerant. After
operating the powerful vacuum pump, open the valve of VC.
Vacuuming time: about 4 hours or more with a vacuum pump
with a capacity of 300 L / min (When using a vacuum pump
with a small capacity value, vacuuming is performed until the
degree of vacuum is 3 Torr or less as a guide)
3.3
Complete evacuation
Procedure : Specified time (about 4 hours or more) Shut each valve and stopper temporarily
after evacuation and stop the pump.
If vacuum evacuation on the low temperature side is carried out together,
disconnect from the refrigerant port.
Valve state
open
shut
VC
○
VG
○
VL
○
VH
○
VR
○
(
For high temperature side only, VR shut
→
)
-45-
Содержание MDF-DU502VH
Страница 8: ...Dimension MDF DU502VH 5 ...
Страница 9: ...MDF DU702VH 6 ...
Страница 17: ...Wiring Diagram 14 ...
Страница 18: ...main Circuit Diagram 15 ...
Страница 19: ...power 16 ...
Страница 20: ...USB 17 ...
Страница 73: ...WIRING YG Y Y GR B G W W W Y G R BL Y W R R BL R OR B BL R OR B Y W Y G Y G R BL 70 ...