82
3-2-2 Startup of Laser Marker
1.
Turn ON ( | ) the key switch of the controller.
(Insert the key and turn it toward ON ( | ) side.)
The main indicator flashes in green, and changes into lighted-up status after approx. 75 seconds.
Turn the key switch toward ON ( | ) side
MAIN
Flash in green
i
Light up in green
Notice
•
Since the ON/OFF operation of the key switch puts load to laser marker, do not turn off the power supply until completing
the system start.
•
In case of turning ON the power supply after turning OFF, leave the interval at least 5 seconds between ON and OFF.
2.
The operation screen is appeared after the system is started.
Reference
•
To switch the display language, refer to “4-16-7 Language Selection” (P.269).
ME-LP400V-OP-6
Содержание LP-V Series
Страница 11: ...11 MEMO ME LP400V OP 6 ...
Страница 32: ...32 1 Product Overview ME LP400V OP 6 ...
Страница 58: ...2 Installation and Connection ME LP400V OP 6 ...
Страница 77: ...3 Basic Operation Procedure ME LP400V OP 6 ...
Страница 121: ...4 Description of Operation Screen ME LP400V OP 6 ...
Страница 146: ...146 Symbol ME LP400V OP 6 ...
Страница 271: ...271 MEMO ME LP400V OP 6 ...
Страница 272: ...Maintenance ME LP400V OP 6 ...
Страница 291: ...Troubleshooting ME LP400V OP 6 ...
Страница 308: ...Appendix ME LP400V OP 6 ...
Страница 328: ...Index ME LP400V OP 6 ...
Страница 333: ...No 9000 0062 14V ...
Страница 334: ... Panasonic Industrial Devices SUNX Co Ltd 2003 2018 July 2018 9000 0062 14V ...