Conditions for Configuring the Air Synchronization
•
Master CS2 must be within range of Master CS1.
•
It is recommended that Master CSs be placed in the middle of the installation site.
•
Both a Primary CS and Secondary CS should be assigned to Slave CSs.
•
When using only two CSs on the network (only two CSs are connected to the PBX), make sure that you
do not create a Master CS2.
•
All traditional CSs are automatically assigned and fixed as Master CS1.
•
When using IP-CSs and traditional CSs in the same area, make sure that you do not create a Master CS2.
•
When synchronizing CSs, do not create loops as in the examples below:
[Examples]
•
It is recommended that the number of levels in the synchronization hierarchy is minimized for stable air
synchronization. The maximum number of levels is 4.
Installation Guide
55
5 Appendix