6.1-5
Maintenance
•
Next remove any excess grease.
Surplus grease is a source of accidents caused by slipping and also
contaminates the environment.
As most of the lubrication points on the crane involve lubrication loss (grease is
consumed or enters the environment), we recommend the use of biodegradable
greases.
Care of extendable cylinder piston rods:
If the extendable arms are never completely retracted to the transport
position the extendable cylinder piston rods may suffer oxidation. The
extendable cylinders (extendable arms) must therefore be completely
retracted once a month.
6.1-5
Operating Hours Counter
The operating hours counter shows you the total number of operating hours, the hours remaining until
the next servicing, and the hours until the next maintenance. The operating hours counter begins at
1000 and counts backwards to 0. Then it counts upward from 0 with a minus sign in front (-1, -2, -3,
etc.).
When you turn on the crane (power), the total operating hours of the crane will be shown on the
display for 10 seconds.
After 10 seconds, the display shows you the number of operating hours remaining until the next
serice.
The maintenance must be performed by the crane operator every 50 hours (950, 900, 850, etc.).
When the counter reaches 100 hours before the next service, the display begins to blink and
continues to blink until it reaches 0 hours. The service should be performed at about 0 hours.
If you operate your crane for fewer than 1000 hours annually, you must have the service performed
by the service centre at least once a year.
Display: Begins to blink when it
reaches 100 hours.
100
-1
Red light: burns when 0
hours is reached.
Содержание PK 23002
Страница 1: ......
Страница 2: ......
Страница 4: ...Inhalt ...
Страница 6: ...Inhalt ...
Страница 8: ...1 1 1 Overview of dangers ...
Страница 16: ...1 3 6 During crane operation ...
Страница 17: ...CONTENTS 2 1 CHECKS 2 1 1 DAILY VISUAL INSPECTION AND FUNCTIONAL CHECK Before crane operation Chapter 2 ...
Страница 18: ...2 1 1 Checks ...
Страница 20: ...2 1 1 Checks ...
Страница 22: ...3 1 1 An overview of the crane ...
Страница 40: ...4 1 1 During crane operation ...
Страница 68: ...4 3 6 Additional equipment ...
Страница 70: ...5 1 1 Ending crane operation ...
Страница 80: ...5 2 1 After crane operation ...
Страница 82: ...6 1 1 Maintenance ...
Страница 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Страница 94: ......