Preparings for crane operation
3.2-6
3.2-6 Putting crane into operating position
The preconditions for extending the crane are: the vehicle is properly supported and the mechanical
extensions are retracted and secured as described in Chapter 4.3.
If extensions or a fly jib are not properly retracted and secured they can slide out
of the hydraulic extendable arms when the crane is being extended and then
represent a high accident risk for you and others.
In your activity follow all the safety instructions in Chapter 1.
Cranes with floor control stand: cranes with floor control must be put into operating position from A-
control stand.
Control stand: Opposite side
(Side B)
Control stand:
Control valve side (Side A)
A crane with floor control must be extended from side A. Otherwise
there is danger of injury as the crane arm slews upwards.
Cranes with radio remote control: On cranes with radio remote control make sure that you are not in
the vicinity of the boom as it slews upwards. Choose a standing place outside the danger area of the
crane (see chapter 4).
Raised-stand control: Cranes with raised-stand control are additionally equipped with floor control and
must be extended only from the floor control stand (Side A).
Содержание PK 23002
Страница 1: ......
Страница 2: ......
Страница 4: ...Inhalt ...
Страница 6: ...Inhalt ...
Страница 8: ...1 1 1 Overview of dangers ...
Страница 16: ...1 3 6 During crane operation ...
Страница 17: ...CONTENTS 2 1 CHECKS 2 1 1 DAILY VISUAL INSPECTION AND FUNCTIONAL CHECK Before crane operation Chapter 2 ...
Страница 18: ...2 1 1 Checks ...
Страница 20: ...2 1 1 Checks ...
Страница 22: ...3 1 1 An overview of the crane ...
Страница 40: ...4 1 1 During crane operation ...
Страница 68: ...4 3 6 Additional equipment ...
Страница 70: ...5 1 1 Ending crane operation ...
Страница 80: ...5 2 1 After crane operation ...
Страница 82: ...6 1 1 Maintenance ...
Страница 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...