4.1-3
During crane operation
Never exceed the lifting capacities stated on ancillary equipment and load lifting gear. When using
sling ropes, sling chains and lifting straps observe the loading table of the respective manufacturer.
In working with mechanical extensions the permissible lifting capacity
of the extension used determines the maximum permissible lifting
capacity. This must be stated clearly on the side of the respective
extension (see DA 069).
Therefore fasten your load only on the mechanical extension suitable for such or on a hydraulic
extension arm.
Lifting capacity plate for a crane in design C
1 Design indicated (crane of design C) by stamped
triangle
2 Outreach details
3 Versions (load arm variants)
4 Load capacity values
Содержание PK 23002
Страница 1: ......
Страница 2: ......
Страница 4: ...Inhalt ...
Страница 6: ...Inhalt ...
Страница 8: ...1 1 1 Overview of dangers ...
Страница 16: ...1 3 6 During crane operation ...
Страница 17: ...CONTENTS 2 1 CHECKS 2 1 1 DAILY VISUAL INSPECTION AND FUNCTIONAL CHECK Before crane operation Chapter 2 ...
Страница 18: ...2 1 1 Checks ...
Страница 20: ...2 1 1 Checks ...
Страница 22: ...3 1 1 An overview of the crane ...
Страница 40: ...4 1 1 During crane operation ...
Страница 68: ...4 3 6 Additional equipment ...
Страница 70: ...5 1 1 Ending crane operation ...
Страница 80: ...5 2 1 After crane operation ...
Страница 82: ...6 1 1 Maintenance ...
Страница 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Страница 94: ......