4.3-3
Additional equipment
Separating screw couplings:
•
Switch off pump
•
Remove pressure from the lines by operating the control levers in both switching positions.
•
Separate
dust
caps
•
Separate screw couplings.
•
Screw on dust caps and stow the hoses properly in the hose boxes.
Multifaster
Plug, guiding bolt and coupling have to be cleaned every time before starting the Multifaster.
Connecting the Multifaster:
•
Switch off the pump
•
Make lines pressure-free by operating the control
lever
Open the protective lid (1) until it locks
Press the safety button (2) and open the tightening lever (3)
1
2
33
Put the plug on the coupling (4)
4
Close the tightening lever (5) until the safety button locks
5
Содержание PK 23002
Страница 1: ......
Страница 2: ......
Страница 4: ...Inhalt ...
Страница 6: ...Inhalt ...
Страница 8: ...1 1 1 Overview of dangers ...
Страница 16: ...1 3 6 During crane operation ...
Страница 17: ...CONTENTS 2 1 CHECKS 2 1 1 DAILY VISUAL INSPECTION AND FUNCTIONAL CHECK Before crane operation Chapter 2 ...
Страница 18: ...2 1 1 Checks ...
Страница 20: ...2 1 1 Checks ...
Страница 22: ...3 1 1 An overview of the crane ...
Страница 40: ...4 1 1 During crane operation ...
Страница 68: ...4 3 6 Additional equipment ...
Страница 70: ...5 1 1 Ending crane operation ...
Страница 80: ...5 2 1 After crane operation ...
Страница 82: ...6 1 1 Maintenance ...
Страница 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Страница 94: ......