4.3-3
Additional equipment
•
Remove the spring cotter from the securing bolt and pull the bolt out.
•
Pull out the mechanical extensions so far until you can secure them with the bolt again in the
extendable arm. It is prohibited to let the extensions fall out of the load arm by placing it in a steep
position.
It is prohibited to let the mechanical extensions fall out in vertical position of the outer boom!
•
Secure the bolt again with the spring cotter.
•
The maximum permissible load capacity of the used extension (see model label or side label on
the extension) must not be exceeded. This is even applicable when the extension is completely
retracted and secured.
Inadequately secured mechanical extensions represent a danger of
fatal injury for you and other people. Always use the bolts and spring
cotters provided by Palfinger.
The maximum load capacity of the crane is always determined by the weakest load taking element.
Therefore, always observe the load-carrying capacities specified on the load taking elements.
Содержание PK 23002
Страница 1: ......
Страница 2: ......
Страница 4: ...Inhalt ...
Страница 6: ...Inhalt ...
Страница 8: ...1 1 1 Overview of dangers ...
Страница 16: ...1 3 6 During crane operation ...
Страница 17: ...CONTENTS 2 1 CHECKS 2 1 1 DAILY VISUAL INSPECTION AND FUNCTIONAL CHECK Before crane operation Chapter 2 ...
Страница 18: ...2 1 1 Checks ...
Страница 20: ...2 1 1 Checks ...
Страница 22: ...3 1 1 An overview of the crane ...
Страница 40: ...4 1 1 During crane operation ...
Страница 68: ...4 3 6 Additional equipment ...
Страница 70: ...5 1 1 Ending crane operation ...
Страница 80: ...5 2 1 After crane operation ...
Страница 82: ...6 1 1 Maintenance ...
Страница 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Страница 94: ......