Powering On the Server the First Time
93
When power is applied, the OK LED flashes while the SP initializes. After a few
minutes, the OK LED slowly flashes indicating that the server is in standby power
mode. See
“Front Panel Components (Installation)” on page 5
. The server is not
yet powered on.
5. Power on the server.
See
“Power On the Host for the First Time” on page 103
.
Related Information
■
“Connect the Chassis Ground Wire” on page 94
■
“Power On the Host for the First Time” on page 103
Assembling DC Power Cords and
Applying DC Power
No.
Description
1
Power supply 1
2
Power supply 0
Step
Description
Links
1.
Connect the chassis to earth ground.
“Connect the Chassis Ground Wire” on
page 94
2.
Build the DC power cords.
“Assemble the DC Input Power Cord” on
page 95
3.
Install the strain relief housings.
“Install Strain Relief Housings” on page 99
Содержание Netra Server X3-2
Страница 1: ...Netra Server X3 2 formerly Sun Netra X4270 M3 Server Installation Guide Part No E27127 04 May 2013 ...
Страница 6: ...vi Netra Server X3 2 Installation Guide May 2013 ...
Страница 26: ...18 Netra Server X3 2 Installation Guide May 2013 ...
Страница 34: ...26 Netra Server X3 2 Installation Guide May 2013 ...
Страница 97: ...Connecting Cables 89 USB Ports on page 86 Video Port on page 86 ...
Страница 98: ...90 Netra Server X3 2 Installation Guide May 2013 ...
Страница 114: ...106 Netra Server X3 2 Installation Guide May 2013 ...
Страница 122: ...114 Netra Server X3 2 Installation Guide May 2013 ...