Powering On the Server the First Time
99
Note –
If you need to remove a wire from the DC input plug, insert the cage clamp
operating lever or a small screwdriver and pull the wire from the DC input plug.
8. Release the lever or remove the tool to secure the wire into the connector.
9. Repeat the procedures for the other two wires to complete the assembly of the
DC input power cable.
10. Repeat this procedure to create as many DC input power cables as you need for
your unit.
11. Install strain relief housings.
See
“Install Strain Relief Housings” on page 99
.
Related Information
■
“Connect the Chassis Ground Wire” on page 94
■
“Install Strain Relief Housings” on page 99
■
“Connect DC Power Cords” on page 102
■
“Power On the Host for the First Time” on page 103
▼
Install Strain Relief Housings
1. Ensure that you have connected the chassis ground wire and assembled the DC
input power cords.
See
“Connect the Chassis Ground Wire” on page 94
and
“Assemble the DC Input
Power Cord” on page 95
.
2. Insert the bottom portion of the strain relief housing into the notch on the DC
input plug until it snaps into place.
Ensure that the strain relief housing snaps into place on the DC input plug. You
cannot complete the assembly correctly if the strain relief housing is not snapped
into place.
3
From chassis ground (green/yellow)
4
From -48V or -60V
No.
Description
Содержание Netra Server X3-2
Страница 1: ...Netra Server X3 2 formerly Sun Netra X4270 M3 Server Installation Guide Part No E27127 04 May 2013 ...
Страница 6: ...vi Netra Server X3 2 Installation Guide May 2013 ...
Страница 26: ...18 Netra Server X3 2 Installation Guide May 2013 ...
Страница 34: ...26 Netra Server X3 2 Installation Guide May 2013 ...
Страница 97: ...Connecting Cables 89 USB Ports on page 86 Video Port on page 86 ...
Страница 98: ...90 Netra Server X3 2 Installation Guide May 2013 ...
Страница 114: ...106 Netra Server X3 2 Installation Guide May 2013 ...
Страница 122: ...114 Netra Server X3 2 Installation Guide May 2013 ...