68
Netra Server X3-2 Installation Guide • May 2013
16. Connect required and optional cables.
See
“Connecting Cables” on page 77
.
Related Information
■
“19-Inch Sliding-Rail Kit (2-Post Rack)” on page 60
■
“Tools Needed for Installation” on page 22
■
“Handling Precautions” on page 20
■
“Rack Cautions” on page 23
Installing the 23-Inch Hardmount Kit
(2-Post Rack)
Use these topics to install the server into a 2-post rack using the optional 23-inch
hardmount kit:
■
“23-Inch Hardmount Kit (2-Post Rack)” on page 69
■
“Install the Server (23-Inch Hardmount Kit)” on page 70
Related Information
■
“Tools Needed for Installation” on page 22
■
“Handling Precautions” on page 20
■
“Rack Cautions” on page 23
Содержание Netra Server X3-2
Страница 1: ...Netra Server X3 2 formerly Sun Netra X4270 M3 Server Installation Guide Part No E27127 04 May 2013 ...
Страница 6: ...vi Netra Server X3 2 Installation Guide May 2013 ...
Страница 26: ...18 Netra Server X3 2 Installation Guide May 2013 ...
Страница 34: ...26 Netra Server X3 2 Installation Guide May 2013 ...
Страница 97: ...Connecting Cables 89 USB Ports on page 86 Video Port on page 86 ...
Страница 98: ...90 Netra Server X3 2 Installation Guide May 2013 ...
Страница 114: ...106 Netra Server X3 2 Installation Guide May 2013 ...
Страница 122: ...114 Netra Server X3 2 Installation Guide May 2013 ...