KP100G
45
10.
Maintenance
Additionally tighten the tightening cap
The cable may thin slightly due to usage conditions.
This requires that you additionally tighten the tightening cap regularly.
Fig, 10-1
Additional tightening of the tightening cap
Others
Please keep the original carton box and use it for transportation of the Omron KP100G PV Inverter when it has to be transported as such for a repair
service.
11.
Troubleshooting
When You Suspect a Problem
Operation does not start immediately even though the connectors are correctly connected.
•
The power generation of the solar modules is insufficient. Operation will begin when the sunlight intensity increases.
The LCD does not show the status “Normal”.
•
The connectors are not correctly connected.
The power generation level is low even on a sunny day.
•
The Screen filter may be clogged, or the service life of the fan may have been reached, in which case the fan needs to be replaced.
•
The solar modules may be obstructed or shaded by something.
•
The grid voltage may have risen. Contact the store from which you purchased the product.
Содержание KP100G
Страница 1: ...KP100G Technical manual Grid Connect Photovoltaic Inverter Part number 1868180 8 A...
Страница 50: ...KP100G 50 EC DECLARATION OF CONFORMITY...
Страница 51: ...KP100G 51 Technical Report...
Страница 52: ...KP100G 52 Declaration of Conformity RD1663 2000...
Страница 53: ...KP100G 53 Declaration of Conformity DK5940...