90
ON/OFF Valve Manipulator (Block Model 221)
Section 6-13
$B32760=0;
WRITECMEM([R/L_SW],$B32760,1);
6: FIELD Selection Display
A Bit Lamp indicates the control site and the lamp is red when control is onsite
(in the field).
7: Open Limit Switch Input Display (ON Display)
A lamp indicates the status of the open limit switch input and the lamp is red
when the open input is ON.
The bit lamp is set as a round single-line lamp with the following display col-
ors.
The label displays “ON” in the rough font.
8: Valve Open Midway Display
A lamp indicates when the valve is open midway and the lamp i s red when
the valve is partially open.
The bit lamp is set as a round single-line lamp with the following display col-
ors.
A Select Shape graphic is used for the Button face display.
9: Closed Limit Switch Input Display (ON Display)
A lamp indicates the status of the closed limit switch input and the lamp is red
when the closed input is ON.
The bit lamp is set as a round single-line lamp with the following display col-
ors.
The label displays “ON” in the rough font.
10: Valve Action Time Error Display
A lamp indicates an error when the corresponding limit switch does not go ON
within the specified time after a fully open or fully close operation. The lamp is
red when an error occurred.
Display color
S4: Control Site Input (085)
Yellow
0
Red
1
Display color
S5: Open limit switch input (015)
Green
0
Red
1
Display color
U3: Valve open midway (023)
Green
0
Red
1
Display color
S6: Closed limit switch input (016)
Green
0
Red
1
Содержание Face Plate Auto-Builder for NS 3.1
Страница 1: ...Face Plate Auto Builder for NS Ver 3 1 Cat No W418 E1 05 SYSMAC WS02 NSFC1 EV3 OPERATION MANUAL...
Страница 2: ...WS02 NSFC1 EV3 Face Plate Auto Builder for NS Ver 3 1 Operation Manual Revised December 2007...
Страница 3: ...iv...
Страница 5: ...vi...
Страница 13: ...xiv...
Страница 21: ...6 Upgrades Made for Version 3 1 Section 1 6...
Страница 27: ...12 Uninstalling the Face Plate Auto Builder for NS Section 2 2...
Страница 28: ...13 SECTION 3 Basic Operation Flow 3 1 Basic Operation Flow 14...
Страница 39: ...24 Merging Projects Section 4 2...
Страница 141: ...126 Segment Program 3 Block Model 158 Section 6 19...
Страница 143: ...128 Revision History...