
8-16
STRAIN
0
8
Scaling to
Display
Engineering
Units
Figure 8-5 S1 and S2 Signal Input Jumper Positions
B. Wire the transducer as shown in Figure 8-6 (Refer to Section 7
for additional information).
Always check the meter’s excitation prior to wiring your sensor to
the meter.
TOP VIEWS
J3
J9
A B
A
D
G
H
V
L
P
S
T
U
B
C
E
F
J
K
N
M
R
Q
S2
S1
Figure 8-4 S3 Main Board Jumper Positions
Install jumpers on S1 and S2 as shown in Figure 8-2.
DISPLAY
BD
C
B
A
S3
SIGNAL INPUT BD
MAIN BD
J9
J2
J1
J3
AC POWER BD
W1
W3
W2
S4
A
T1
B
C
R38
J10
(FACTORY CONFIGURED)
B
Содержание DP461-S
Страница 96: ......