18
3.2 Installation procedure workflow
MAJ-2301 INSTRUCTION MANUAL
Ch.3
The following chart shows the order of installing this instrument and the related instrument.
3.2
Installation procedure workflow
1
Connect the wireless unit.
Section 3.3 on page 19
2
Attach the foot switch hanger.
Section 3.5 on page 24
3
Insert batteries in the foot switch.
Section 3.5 on page 24
4
Perform pairing.
Section 3.6 on page 29
5
Assign the functions of the switches.
Section 3.7 on page 33
6
Store the foot switch.
Section 3.8 on page 34