Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 10
A8.
Position Plywood so it sits almost flush with outside of floor joist framing (see
Note
). When
correctly positioned, attach to all floor joists with approximately
24 - 1 1/4” Screws
. Use screws
every 16”.
Note:
Plywood is cut slightly smaller than
floor framing. Keep plywood seams tight.
A7.
Position
Plywood Floor
pieces
(2) on top of completed floor joists.
Front
A6.
When in place, level floor completely before proceeding.
Important:
Floor should be
completely level before
moving to next step
.