CHAPTER 3 - MAINTENANCE PROCEDURES
Explorer
®
Series Service Manual
31
Ohaus Corporation www.ohaus.com
4. Remove the Load Cell
–
remove the 4 load cell screws from the bottom housing. Lift the Load
Cell Module from the Base. Do not lift by the Pan Support Cone or the cables.
Re-Assembly:
Reverse the disassembly procedure to assemble the balance. Ensure that there is no foreign
material between the Base mounting surfaces and the Load cell.
Take special care to route the wires and cables as shown in the following pictures. Proper routing is
important for RFI/ESD performance. Ensure that the wires or cables are not pinched during re-
assembly.
InCal cable routing
–
Draftshield models:
Item
号
Part No.
编号
Description
Qty
数
Item
号
Part No.
编号
Description
Qty
数
Item
号
Description
Qty
数
1
S tatic strip
1
2
F ixture
1
S/N
Dept.
门
QTY.
数
1
2
3
S/N
Dept.
门
Station code
码
1
2
3
1st Version
Ying Qi
A
9/1/2010
DOCUMENT NUMBER
编号
:
PRODUCT FAMILY
产
:
PRODUCT MODEL
产
号
:
VISUAL Assembly WI
视组装
EX
Hard copy
Process
过
Originator
Tooling and Equipment
设备
Material
PREPARED BY
:
Ying QI
WI Request: 1.Material; 2.Tools&Equipment; 3.Process description; 4.Picture; 5.Notice; 6.Scope; 7.Version; 8.Originator&Effective date,
Category of distribution
发类
APPROVED BY
:
Paperless
纸
P ic
Explorer
Explorer
PROCESS
:
HISTORY TRACKING
OF VISUAL AID
CHANGES
历记录
OPERATION TITLE
称
:
SHEET
页码
:
1 of
13.connect the incale cable with the interface of the main PCB.
EHS(
环
)
项
:N/A
DOCUMENT
REVISION
ISSUE DATE
发
A ssem bly
Notice
结项
:
13
Nipper
Incale cable
Содержание Explorer Balances
Страница 1: ...Explorer Balances Service Manual...
Страница 2: ......
Страница 6: ......
Страница 82: ......