13 Chronology of Different Mea
s
uring Proce
ss
e
s
Instruction Manual Myopia Master® (G/68100/EN Rev04 0820)
47 / 92
13 Chronology of Different Mea
s
uring Proce
ss
e
s
The chronology of three different measuring processes is outlined briefly
below.
1
You enter a patient in the patient data management and then con-
duct the measurement.
The examination data are automatically saved under the newly
entered patient’s name
.
2
You start directly with the measuring operation and then subse-
quently save the examination under an existing patient’s name. Al-
ternatively, you can also enter a new patient after performing the
measuring operation
.
3
You perform a measuring operation without saving the examination
under a patient’s name
.
13.1 Enter P Mea
s
ure
Press the button [Patient] in the patient data management.
Create a new patient, as described in
.
The newly entered patient appears in the list of patients and is
highlighted in blue.
Start the measuring operation by pressing the [Measure] button.
Press the optional joystick button.
Conduct the measurement
.
When the measuring operation has been completed, the overview
screen appears
.
The conducted examinations are automatically saved in the patient
data management.
The saved examinations can be viewed again at any time
.