![OBO Bettermann isCon BA 45 SW Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/obo-bettermann/iscon-ba-45-sw/iscon-ba-45-sw_system-instructions_722016032.webp)
OBO Bettermann
32 | EN
Installing the isCon® system
Assembling the air-termination rod
5 2 1
Air-termination rod with internal isCon
®
conductor
1
2
3
4
5
6
7
8
Figure 26:
Air-termination rod with internally routed isCon
®
conductor
Legend:
1
Air-termination rod
2
Internal connection element
3
Isolated central rod
4
Potential connection with potential connection element
5
Retaining mast with side exit
6
Air-termination rod stand with side exit
7
Concrete plinth with edge protection
8
Internally routed isCon
®
conductor with connection element
Содержание isCon BA 45 SW
Страница 1: ...01 2018 EN isCon System instructions Building Connections...
Страница 60: ...OBO Bettermann 60 EN Mounting variants x 1 2 6 5 3 4 Figure 65 isCon conductor connected to metallic parapet...
Страница 66: ...OBO Bettermann 66 EN Own notes...
Страница 67: ...System instructions OBO isCon EN 67 Own notes...