Page 12 of 43
Installation & Connection
Heater Condition
Upon receiving the heater, inspect its packaging thoroughly for any apparent signs of damage and
IMMEDIATELY notify your supplier if there are any signs of rough handling.
Plumbing
The unit’s exclusive titanium heat exchanger requires no special plumbing arrangements except a
bypass.
Flow Rate
Ensure the water pump and plumbing is capable of meeting or exceeding the
required flow rate in accordance with the specifications on Page 5 of this
manual.
Location
Connect the unit in the pool pump discharge (return) line downstream of all filter
and pool pumps, and upstream of any chlorinators, ozonators or chemical
pumps.
Oasis heat pump models have quick coupler fittings which
accept 40mm PVC pressure pipe for connection to the pool
or spa filtration piping.
Ensure pipework connecting to the inlet/outlet unions is
appropriately supported as any lateral strain may cause the
rubber O-rings to pinch and leak.
Lubricate all O-rings with silicon grease prior to fitment and apply plumbing tape to the threads for
additional security.
Water unions step by step
1
2
3
Содержание RAPID PRO RP14
Страница 1: ......
Страница 30: ...Page 29 of 43 Troubleshooting WIRING DIAGRAM 1...
Страница 31: ...Page 30 of 43 Troubleshooting WIRING DIAGRAM 2...
Страница 32: ...Page 31 of 43 Troubleshooting WIRING DIAGRAM 3...
Страница 43: ...Page 42 of 43 Notes...