4. Installation Instructions
During all stages of the installation, use the appropriate Personal Protective Equipment (PPE) and
ensure that all battery stacks are offline.
Do
NOT
energize the system until all connections to the Battery Control Panel have
been made.
4.1. Mechanical Installation
4.1.1. Dimensions and Weight
The unit weighs approximately 13.6 kg [30 lbs].
Figure 4. Nuvation Energy Battery Control Panel Dimensions
Nuvation Energy Battery Control Panel - Product Manual
Document ID: NE-PM-005
11
Rev 1.1, 2020-10-14
Curie Update 2