5. Setup and Configuration
Your Battery Control Panel enables control of multiple Stack Switchgear units. Each Stack Switchgear
will need to be installed and set up individually before setting up the Battery Control Panel.
For instructions on how to install Stack Switchgear units, please refer to the
Nuvation
Energy Stack Switchgear: Product Manual
.
5.1. Getting Started
Overview of steps:
1.
External Network Configuration
2.
3.
Nuvation Energy Battery Control Panel - Product Manual
Document ID: NE-PM-005
17
Rev 1.1, 2020-10-14
Curie Update 2