Installation and Operation Manual
TFTN 085-199
14
Figure 3-2 Wall Mounting Instructions
Locate the wall mounting brackets and
hardware furnished with the boiler.
(A)
(B)
(C)
(D)
(E)
(F)
(F)
A
– (4) Fischer plug anchor, p/n 86885
B
– (4) 5/16” washer, p/n 86886
C
– (4) 5/16” x 2-1/2” lag bolt, p/n 86884
D
– (3) 1/4” machine screw [TFTN085-199]
– (4) 1/4” machine screw [TFTN285-399]
E
– (1) Upper wall mount bracket, p/n 86938
F
– (1) Lower wall mount bracket [TFTN085-
199], p/n 86937
– (1) Lower wall mount bracket set
[TFTN285-399], p/n 86460
Secure the upper wall mount bracket to the wall
using the supplied lag bolts and washers. Ensure
the bracket is level. Use the Fischer plug anchors
if a stud is not available.
With the help of an assistant, hang the boiler on the upper
wall mount bracket. Align the openings in the back of the
boiler with the hooks of the wall mount bracket. Make
sure that it is securely hooked and that the wall mount
bracket remains securely fastened to the wall.
Loosely install the lower wall mount bracket(s) to the
bottom of the boiler, and then fasten the bracket to
the wall with field supplied hardware. Tighten the
bracket to the bottom of the boiler once the boiler is
plumb.
When hitting a stud
When using Fischer
plug anchors
Reverse view
Two people are required to lift the
boiler into place. Failure to follow
these instructions may result in
property damage or personal injury