
Table of Contents
READ THIS PAGE FIRST
BEFORE STARTING INSTALLATION
3
HOW YOUR WATER CONDITIONER WORKS
4
SPECIFICATIONS
SPECIFICATION / SYSTEM DIMENSIONS
5
BRINE TANK DIMENSIONS
6
INSTALLATION
UNPACKING / INSPECTION OF TWIN TANK MODEL
7
UNPACKING / INSPECTION OF CABINET MODEL
9
BEFORE INSTALLATION
11
PREPARATIONS
12
PREPARATIONS / INSTALLATION STEPS
13
INSTALLING BRINE TANK
14
INSTALLATION
15
OPERATION
STARTUP INSTRUCTIONS
17
DURING REGENERATION/PLUMBING SYSTEM CLEAN-UP
19
MAINTENANCE INSTRUCTIONS AND SCHEDULE
20
RES-UP® FEEDER INSTALLATION INSTRUCTIONS
22
SERVICING ECONOFLO VALVE
23
REPLACEMENT
TIMER REPLACEMENT
23
CLEAN INJECTOR ASSEMBLY / PISTON AND/OR BRINE VALVE ASSEMBLY
REPLACEMENT/ REPLACE MOTOR
24
REPLACING THE BYPASS AND METER CABLE
25
REPLACE DRAIN LINE FLOW CONTROL / REPLACING PCBS
26
PARTS BREAKDOWN
27
PARTS
POWERHEAD
28
VALVE BODY
29
BYPASS
30
CABINET
31
TROUBLE SHOOTING
32
MASTER PROGRAMMING
33