
16
17
6(77,1*6
83
'2:1
6(/(&7
TIME
05:22 PM
Sample
Connection
Sample
Connection
SERVICE
BYPASS
Sample
Connection
Sample
Connection
SERVICE
BYPASS
MANUAL REGEN
Delay
Immediate
BACKWASH
IIIIIIIIIIIIIIIIIIIIIIII 15 Minutes*
BRINE DRAW
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 50 Minutes*
BACKWASH
BRINE DRAW
RINSE (SKIP)
REFILL (SKIP)
Regen Sequence
- Once in Regeneration, the cycle can be skipped by pressing any button.
The controller will show the
following on the screen - Time,
Date and Remaining Gallons or
Days.
*NOTE
Times indicated
here are
example only.
STARTUP INSTRUCTIONS
3. Add Water to Brine Tank
Open the brine tank /cabinet salt lid and add water as
per the info below. Do not add salt to the brine tank at
this time.
BTR-100 -2.5 US Gallons
1. Connect the Transformer to the Valve
Plug the 12-volt transformer into a 120 VAC 60 Hz outlet.
Familiarize with Button Configuration:
2. Screen Display
4. Manually Regenerate the Valve
Manually index the valve with the control knob to BA.WA. or press
SELECT
and hold display will come up showing
delay flashing press Up or Down Arrows
to immediate and press
SETTINGS
to initiate a manual
regeneration. Once the valve is in the Backwash (BA.WA.) position please unplug.
SELECT
- This function is to accept the values if changed and advance to the next
page in the menu.
UP/DOWN
- These buttons are used to increase or decrease the value of the
settings while in the programming mode.
SETTINGS
- This function is to enter the basic set up information required at the
time of installation.
Key Pad Configuration: