NOVO EconoFlo Series Скачать руководство пользователя страница 11

10

11

8QILOWHUHG:DWHU%\SDVV

/RRS&XW &DSSHG

*URXQG6WUDS5HTXLUHG%HFDXVH

RI%UHDNLQ&RQWLQXLW\

)LOWHUHG:DWHU/LQHLQ+RPH

Fig. 1.

BEFORE INSTALLATION

Make sure you have a copy of your most recent water test results. If your water has not been tested previously you can contact 

your supplier of this product to obtain a water sample bottle to be sent to one of our facilities for a free analysis. 

It is important 

that this product not be installed until you have this information

In all cases where metal pipe was originally used and is later interrupted by poly pipe or the Noryl bypass valve or by physical 

separation, an approved ground clamp with no less than #6 copper conductor must be used for continuity, to maintain proper 

metallic pipe bonding.

Inspecting and Handling Your EconoFlo Softener* 

Inspect the equipment for any shipping damage. If damaged, notify the transportation company and request a damage 

inspection. Damage to cartons should also be noted.
Handle the filter unit with care. Damage can result if it is dropped or set on sharp, uneven projections on the floor.
Do not turn the filter unit upside down. 

To Insure this Product Functions Properly:

Your feed water line size to the unit must be a minimum of 3/4 inch with an operating pressure of no less than 30 

psi and no more than 125 psi

.

 

MECHANICAL: 

 

 Do not use petroleum based lubricants such as petroleum jelly, oils or hydrocarbon based lubricants.Use only 100% silicone 

lubricants (grease packet provided in parts kit). All plastic connections should be hand tightened only. Teflon tape may be used 

on connections that do not use an O-ring seal. Do not use pliers or pipe wrenches except where indicated by Nut shape (eg. pipe 

adapters) All plumbing must be completed according to local codes. Soldering connections should be done before connecting 

any pieces to the pipe as excessive heat can damage them. 

 

Tools Required for Installation:
NOTE: We recommend installation only be completed by a competent installer or 

plumbing professional to insure this product is installed in accordance with local 

plumbing codes.

Two adjustable wrenches

Additional tools may be required if modification to home plumbing is required.

Plastic inlet and outlet fittings are included with the filter.  To maintain full valve flow, 3/4” or 1” pipes to and from the  

 

filter fittings are recommended. You should maintain the same, or larger, pipe size as the water supply pipe, up to the filter  

 

inlet and outlet. 

Use copper, brass, or PEX pipe and fittings.

Some codes may also allow PVC plastic pipe.

ALWAYS install the included bypass valve, or 3 shut-off valves. Bypass valves let you turn off water to the filter for repairs if  

 

needed, but still  have water in the house pipes.

5/8” OD drain line is needed for the valve drain.  A 10’ length of hose is not included with some brands. 

 

NOTE

All government codes and 

regulations governing the 

installation of these devices 

must be observed.

NOTE

If a severe loss in water 

pressure is observed when 

the filter unit is initially 

placed in service, the filter 

tank may have been laid on 

its side during transit. If this 

occurs, backwash the filter 

to “reclassify” the media. 

*NOTE

 Due to transportation 

and climatic conditions all 

connections including the 

valve to the tank need to be 

checked at time of  

installation and tightened if 

necessary. 

NOTE

Check your local electrical 

code for the correct clamp 

and cable size.

CAUTION!

If the ground from the 

electrical panel or breaker 

box to the water meter or 

underground copper pipe 

is tied to the copper water 

lines and these lines are cut 

during installation of the No-

ryl bypass valve and/or poly 

pipe, an approved grounding 

strap must be used between 

the two lines that have been 

cut in order to maintain 

continuity. The length of the 

grounding strap will depend 

upon the number of units 

being installed and/or the 

amount of copper pipe being 

replaced with plastic pipe. 

See Fig. 1.

Содержание EconoFlo Series

Страница 1: ...nt maintenance procedures for the continued proper operation of your unit These MUST be performed regularly for your warranty to remain valid 2 Read all instructions carefully before operation 3 Avoid...

Страница 2: ...ING BRINE TANK 14 INSTALLATION 15 OPERATION STARTUP INSTRUCTIONS 17 DURING REGENERATION PLUMBING SYSTEM CLEAN UP 19 MAINTENANCE INSTRUCTIONS AND SCHEDULE 20 RES UP FEEDER INSTALLATION INSTRUCTIONS 22...

Страница 3: ...ls of iron manganese sulfur and sediments Damage to pistons seals and or spacers within the control valve are not covered in this warranty due to the harsh environment It is recommended to regularly i...

Страница 4: ...tener can run for days before running out of sodium and when it does the sodium is replenished in only a matter of a few hours When using a softener to remove both hardness and dissolved iron it is im...

Страница 5: ...g The manufacturer reserves the right to make product improvements which may deviate from the specifications and descriptions stated herein without obligation to change previously manufactured product...

Страница 6: ...3 159 7 20 3 x 37 4 21 9 x 21 9 x 72 2 385 0 174 2 BTR 200 Grey 53 0 200 3 23 0 x 40 5 24 6 x 24 6 x 84 700 0 316 7 All brine tanks come with salt grid safety float and brine well VDOW JULG V VWHP VD...

Страница 7: ...ollowing 1 Control Valve 2 Tank 3 Parts Box 4 Owners Manual 5 Drain Hose Clamp Not included in some brands 6 Brine Tank Assembly UNPACKING INSPECTION OF TWIN TANK MODEL 1 Control Valve 2 Tank Distribu...

Страница 8: ...Not Included with some models 5 Brine Tank Assembly 2 Control Valve 3 Media Box Qty depends on Models Distributor Tube Inside the Tank Media Inside the Tank Media Type will depend on what models were...

Страница 9: ...60010006 Bypass Tool 60010026 O Rings Attached 60090010 2 X 3 4 Elbow Adapter 60010630 Transformer 92360 Grease Packet UNPACKING INSPECTION OF CABINET MODEL 1 Cabinet with Valve attached EFC20 EFC30 2...

Страница 10: ...9 SEP 9 Q 2020 A OCT A 10 B NOV B 11 C DEC C 12 D 13 E 14 F 15 G 16 H 17 I 18 J 19 K 20 L 21 M 22 N 23 O 24 P 25 Q 26 R 27 S 28 T 29 U 30 V 31 Valve Serial CheckValveType andValve Serial The right St...

Страница 11: ...ge them Tools Required for Installation NOTE We recommend installation only be completed by a competent installer or plumbing professional to insure this product is installed in accordance with local...

Страница 12: ...alve and Screw theValve inside theTank such that the power cord doesn t get caught between the valve and the tank d Unplug the riser tube carefully position the valve over it and turn the valve into t...

Страница 13: ...valve solder the threaded copper adapters to the copper pipe and then usingTeflon tape screw the assembly into the bypass valve Do not use pipe thread compound as it may attack the material in the val...

Страница 14: ...he brine line already come installed from the factory Leave the other end of the brine line tube inside the brine tank f For installation of brine tank at the installation site pull the other end of t...

Страница 15: ...R FLOW NOTE Check local plumbing codes in regards to requirements for use of Check Valve or back flow prevention or vacuum breaker Connect Softener to the HousePlumbing Any solder joints near the valv...

Страница 16: ...CE THERE ARE RAISED ARROWS ON THE BYPASS ASSEMBLY INDICATING DIRECTION OF WATER FLOW Connect Softener to the HousePlumbing Any solder joints near the valve must be done before connecting any piping to...

Страница 17: ...ow Do not add salt to the brine tank at this time BTR 100 2 5 US Gallons 1 Connect theTransformer to theValve Plug the 12 volt transformer into a 120 VAC 60 Hz outlet Familiarize with Button Configura...

Страница 18: ...7 for Key Pad Configuration Calculating Compensated Hardness forWater where Iron or Manganese is Present From your water analysis Iron x 4 grains of hardness and or Manganese x 8 grains of hardness Th...

Страница 19: ...NG SYSTEM CLEAN UP The following procedures are guidelines only but have proven successful in most instances Under no circumstances should any procedure outlined below be followed if contrary to the a...

Страница 20: ...ILURE TO FOLLOW BASIC MAINTENANCE SCHEDULE WILL RESULT IN THE UNIT FAILING TO OPERATE PROPERLY AND VOID YOUR WARRANTY CAUTION Liquid brine will irritate eyes skin and open wounds gently wash exposed a...

Страница 21: ...alt in tank will both effect the units capacity and result in hardness slippage Should either of these situa tions happen or the unit fails to regenerate for any other reason please first correct the...

Страница 22: ...e Brine Well lid 2 Measure 2 inches from the top of the tank beside the oblong molding 6 Take off the cover of the Res Care bottle Insert the wick making sure it touches the bottom of the bottle Inser...

Страница 23: ...ditioner installation has a 3 valve bypass system first open the valve in the bypass line then close the valves at the conditioner inlet outlet b If the conditioner has an integral bypass valve put it...

Страница 24: ...seal spacer assembly grease it with silicone lubricant and put back in 5 Replace piston assembly followed by timer assembly 6 Replace the piston assembly and reverse following steps in this section Re...

Страница 25: ...ved before Step 2 If there are TB L and TB H meter type options in PCB programming select TB H Ifthevalveprogramminghasno TB L and TB H options changethemeterratiotothe newvalueasperchartbelow For 65...

Страница 26: ...Pull the drain line clip and remove the drain line elbow and washer 2 Clean replace drain line washer REPLACING PCBS Remove PCBs by removing the screws shown in the picture Drain Line Elbow REPLACE D...

Страница 27: ...istrubutor Valve Media Bed Softener Downflow SingleTank EFC T20 9 x 35 25010028 50010005 10010032 95600 EFC T30 10 x 35 25010043 50010005 95601 EFT40 10 x 47 25010070 50010005 95606 EFT60 12 x 52 2501...

Страница 28: ...0661 Screw ST4 2 12 LargeWafer 1 B17 60010662 Brine Gear 1 B16 60010663 Main Gear 1 B15 60010664 Bnt165 Drive Gear 1 B14 60010677 Idler Gear 1 B13 60010103 Spring Idler 1 B12 60010666 Spring Retainer...

Страница 29: ...ST3 5 13 2 60125 60010027 60032 Piston Assembly Seals and Spacer Kit BrineValve Item s For All Injector Assemblies and Brine Line and Drain LineWashers Part Part Description 60010110 BLFC BUTTON 2 0...

Страница 30: ...4 Bypass Shaft Outlet 1 20 60095614 05030013 O ring 30 2 65 2 19 60010740 05056149B Shaft Seal 2 18 60010069 05056172N Plug Clip Red 2 17 60010740 21709004 Shaft Clip Red 2 16 60010209 05056146M Bypas...

Страница 31: ...020019 TANK ASSY 935 NAT 1 25020020 TANK ASSY 1035 NAT 10 50010020 Distribution Assy 1035 1 9 18280 Top Cone 1 8 60095097 1 BypassValve Assy 1 7 765 ControlValve Grey 1 6 55010031 Softener Low Cover 1...

Страница 32: ...n drain line 1 Air in water system Check well system for proper air eliminator control 2 Incorrect drain line flow control DLFC button Check for proper flow rate F Too much water in brine tank 1 Plugg...

Страница 33: ...be adjusted by a qualified person MASTER PROGRAMMING PROGRAMMING LEVELS There are 3 levels to the valve program Master options and Factory options are typically adjusted at the factory These options l...

Страница 34: ...60 MIN BRINE 60 MIN RINSE 10 MIN RINSE 10 MIN RINSE 10 MIN REFILL 11 1 MIN REFILL 11 1 MIN REFILL 11 1 MIN REG TIME 12 00 AM BACKWASH 10 MIN RINSE 10 MIN SOFTENER MODE FILTER MODE CAUTION Thevaluesint...

Страница 35: ...0 0s 0 0s 0 0s 0 0s 0 0s REFILL 2 0s 2 0s 2 0s 2 0s 2 0s SALT SET 10 12 LBS 12 LBS 12 LBS 12 LBS PRESS UP DOWN FOR 8 SECONDS PRESS UP OR DOWNTO CHANGE PRESS SELECTTO ACCEPT METER DELAYED METER DELAYED...

Страница 36: ...Toll Free 1 877 288 9888 Regina SK Cambridge ON Carmel IN Pottstown PA Phoenix AZ 54816 11 18...

Отзывы: