48
Cable connection
NN47928-302
NN47928-302
Connecting the BSG8ew/12ew/aw/tw PSTN Central Office
Use this procedure to connect the BSG8ew/12ew/aw/tw PSTN Central Office (CO).
Prerequisites
•
Connect power to the BSG8ew/12ew/aw/tw.
•
Obtain a telephone cable with an RJ-11 modular jack.
Procedure steps
Step
Action
1
Plug the RJ-11 modular wall jack from PSTN into the FXO port of the BSG 8ew/
12ew/aw/tw. The FXS are then connected to analog phone lines.
2
Plug the other end of the cable into the telephone company demarcation blocks
of the building.
End
Connecting analog telephones to the BSG8ew/12ew/aw/tw
Use this procedure to connect analog telephones to the BSG8ew/12ew/aw/tw.
Prerequisites
•
Connect power to the BSG8ew/12ew/aw/tw.
•
Obtain a telephone cable with an RJ-11 modular jack.
Procedure steps
Step
Action
1
Plug the RJ-11 modular wall jack from PSTN into the FXO port of the BSG8ew
or BSG12ew/aw/tw. The FXS are then connected to analog telephones.
2
Plug the other end of the cable into the local connecting blocks.
End
Connecting the console to the BSG12ew/aw/tw
Use this procedure to connect the console to the BSG12ew/aw/tw for debugging purposes. A
console cable is provided in the BSG12 shipping box. The console cable is a CAT5 Ethernet cable
with adapter to DB-9 connector that connects to the PC.
Prerequisites
•
Connect power to the BSG12ew/aw/tw.
Содержание BSG12aw
Страница 10: ...10 New in this release NN47928 302 NN47928 302 ...
Страница 24: ...24 Hardware overview NN47928 302 NN47928 302 ...
Страница 44: ...44 Installation options NN47928 302 NN47928 302 ...
Страница 50: ...50 Cable connection NN47928 302 NN47928 302 ...
Страница 52: ...52 System verification NN47928 302 NN47928 302 ...
Страница 66: ...66 Basic procedures NN47928 302 NN47928 302 ...