
36
Chapter 2 Installation
312755-G Rev 00
Installing the breaker interface panel
This section covers the following topics:
•
“Installing the hardware
” next
•
“Connecting cables to the chassis power supplies” on page 38
•
“Routing power supply cables to the BIP” on page 47
•
“Connecting the ground cables to the rack grounding strip” on page 48
•
“Connecting the power supply cables to the BIP” on page 49
•
“Connecting DC input power feeds to the BIP” on page 52
•
“Replacing covers” on page 59
•
“Installing shelf alarm cables” on page 61
Installing the hardware
Before beginning the BIP hardware installation, ensure that you:
•
Always install the BIP in the uppermost position in the rack to allow for
maximum convection cooling requirements.
•
Ground the rack to the same grounding electrode used by the power service in
the area.
The ground path must be permanent and must not exceed 1 ohm of resistance
from the rack to the grounding electrode.
Warning:
Ensure that the DC power source is off or disconnected at the
remote end before you perform any of the steps in this section. You may
need to switch a circuit breaker off or turn off power at the DC input
source. Be sure that the DC input source power is locked out and tagged.
Note:
The 8004DC power supply operates with the BIP. The BIP does
not support the 8005DC power supply.
Содержание 8010co
Страница 6: ...6 312755 G Rev 00...
Страница 10: ...10 Contents 312755 G Rev 00...
Страница 14: ...14 Tables 312755 G Rev 00...
Страница 18: ...18 Preface 312755 G Rev 00...
Страница 66: ...66 Chapter 2 Installation 312755 G Rev 00...