Pro-Meter V2K
Pressure Transducer Calibration
1. Obtain factory serial number from pressure transducer.
NOTE:
Pressure transducers are individually calibrated and serial numbered at the factory.
The serial number is stamped on the pressure transducer.
2. Utilize
system supplied
calibration record as a basis to enter control panel calibration data.
3. Turn OFF system power.
4. Install new pressure transducer.
5. Connect pressure transducer harness connector.
6. Turn ON the system power.
7. Log into HMI Pendant. Proceed
System Login
(above) for login information.
8. Ensure internal meter pressure is at or near zero psi.
9. From the
Main Menu
Screen proceed to the
Setup Login
Screen, and then to the
Level 2 Setup
Screen.
10. Proceed to the
Pressure Sensor Calibration
Screen.
11. Enter the ‘0 psi Cal’ value and the ’Full Scale psi’ value (250 psi) from the calibration sheet.
12. Adjust the ’Zero Offset’ until the ’Scaled Pressure’ reads zero.
CAUTION:
If the pressure transducer requires replacement, calibration information also has to be
entered into the
Pressure Sensor
Calibration
HMI Screen.
Valve Open / Close Test
1. Ensure pressurized air is supplied to V2K meter.
NOTE:
Supply the air input port located on the filter regulator assembly.
Minimum air pressure supplied is 80 psi (5.5 bar).
2. From the Main Menu Screen, proceed to the Setup Login Screen, and then to the Level 1 Setup Screen.
3. Proceed to the Valve Setup Screen.
4.
Enable the OPEN INLET VALVES pushbutton
.
NOTE:
Both inlet valves should now be open. The inlet valves are open when the ball valve indicators
located just below the gravity tank are in
a
vertical
position.
The indicators are the red plastic pointers shown below.
10
Содержание 7440272
Страница 20: ...APPENDIX A 20...