-12-
START-S19
Operating guide
The control panel START-S19 can activate separatelly with
P1
with opening and the closed, the lamp outputs and
test. This can be useful to check the correct working of the outputs and the devices.
r 03
Opening with
DEAD’S MAN SYSTEM
Closing with
DEAD’S MAN SYSTEM
TEST
OPENING slow down
TEST
CLOSING slow down
P1
Access to the MENU
-
t
-
P2
-
L
-
-
r
-
P1 confi rm
P2 - 1° press
P2 - 2° press
P2 - 3° press
Press and
release
Keep pressed
Release
SYMBOLS
P2
Press
P1
in the group
R
we enter in the sub function choosing with
P2
and
P3
, and then confi rm the
P1
.We are now in the settings
R01, R02, R03
...
r 01
r 02
r 04
P3
P1
P1
P1
P1
P1
P1
P1
P1
-
S
-
r 05
r 06
Output for
SIGNAL LIGHT
Output for TEST
P1
P1
P1
P1
DOWN
UP
r 07
Output fot LIGHT
P1
P1
3
Activate the single outputs