5-4 Change of Stitch Length (Fig.13) 

The machine is adjusted to the stitch length of 8mm in our
plant before shipment. You can change the stitch length in 
the following procedure when necessary: 
Loosen  the  nut  B  of  the  feed  crank  stud  A,  and  turn  the
screw  D  on  the  Scale  C.  Turning  it  to  the  right  will  make
the  stitch  smaller  (S),  and  turning  it  to  the  left  larger  (L).
Tighten the nut B only by half and turn the pulley by hand 
to produce a length of seam to confirm whether the required
stitch  length  is  obtained  or  not.  After  the  adjustment,
tighten the nut B firmly. 
Note:  Nut  B  has  left  thread.  When  the  stitch  length is 
changed. Adjust the Needle Guard as below mentioned.

 

 
5-5 Needle Guard (Fig.14) 

Adjust  the  Needle  Guard  B  so  that  the  Looper  point  does
not  hit  the  Needle  when  the  Looper  pass  through  the
concave part of the Needle. The upper edge of the Needle
hole  must  be  even  with  the  lower  furface  of  the  Needle
Guard B when the Needle A is in the lowest position in its
travel. 
To adjust, loosen the Screw C and move the Needle Guard
B  in  the  vertical  direction.  Be  careful  that  the  Needle  A
slightly  touch  the  Needle  Guard  B,  so  that  the  clearance
between  A  and  B  is  0  to  0.1mm.  After  the  adjustment,
tighten the Screw C firmly.

 

 
5-6 Presser Foot (Fig.5 See page 5) 
a) Presser Bar Height (Fig.5) 

Make sure the height of the Presser Bar is set correctly if
the Needle Bar Nut C will not contact the Presser Foot
and if it is possible to remove the Presser Foot D, when
the  Presser  Foot  Lever  is  pushed  down  and  the  Needle
Bar is at the highest position in its travel. 
Loosen  the  Screw  E  and  adjust  the  position  of  the
Presser Bar Connection. Please check the distance 8mm
between the lower surface of the Presser Bar Connection
and the Machine Frame.

 

 

b) Presser Foot Pressure 

Adjust the pressure of the Presser Foot so that the fabric
is fed uniformly. 
Turn the Presser Bar Spring Regulator F to the right to
increase  the  pressure,  and  to  the  left  to  decrease.  Too 
much  pressure  will  cause  thread  break,  but  too  weak
pressure will cause the unsuccessful chaining on the end
of the fabric.

 

5. Adjustment

/調整 

5-4  縫い目幅の調整(Fig.13) 

この製袋用ミシンは縫い目幅 8mm に調整し出荷していま
す。縫い目幅を変更する時は、次の順序で調整してくださ
い。 

 

送リ調節軸 A のナット B を緩めてください。 
注)ナット B は左ネジです。回す方向に注意してください。

 

目盛板 C の上にあるネジ D を回します。 
ネジ D を右に廻すと縫い目幅は小さくなり(S)、左に廻すと
縫い目幅は大きくなります(L)。 

 

ナット B を仮締めしてテスト縫いをしてください。テスト袋の
縫い目を見て希望の縫い目幅になっているかどうか確認
してください。 
確認ができましたらナット B をしっかり締め付けてください。
注)ナット B は左ネジです。縫い目幅を変更する時は必ず
針ガードも調整してください。(下記ご参照)

 

 

5-5  針ガードの調整  (Fig14) 

針ガード B は、ルーパーが針のえぐり部の横を進む時、ルー
パーの先端が針にぶつからないように調整します。(0〜
0.1mm) 
針がもっとも下がった時、針の穴の上面と針ガード B の下面
が一致するようネジ C を緩めて針ガードは針にかるく接触す
るように注意してください。調整が終わったら、ネジ C をしっ
かりと締め付けてください。 
 
 
 

5-6  押エ金の調整(5 ページ Fig.5) 
a) 高さ調整 

押エ揚ゲレバーをプーリーの方向に一杯押し下げて押エ
棒を上げ、針棒をもっとも上げた位置にした時、針棒ナッ
トが押エ金にあたらず、押エ金の取り外しができる状態が
適正です。 
押エ棒抱キの下面とミシン本体の間隔は 8mm です。 
押エ棒抱キのネジ E を緩めて、押エ棒抱キの位置を調整
してください。 
 

 
 

b) 押エ圧の調整 

袋が一定に送リ出されるように押エ金の押エ圧を調整しま
す。 
押エ棒スプリング調節 F を右に廻すと押エ圧が強くなり、
左に廻すと弱くなります。 
押エ圧が強すぎると糸切れの原因になります。しかし弱す
ぎると空縫いが出なくなります。

 

9

Fig.14

Fig.13

Содержание DKN-3

Страница 1: ...NLIF 008 NEWLONG INDUSTRIAL CO LTD NLI 016...

Страница 2: ...ntents of this manual are subject to change without prior notice for improvement and safety purpose DKN 3 DKN 3 The instruction manual and parts list is subject to change without prior notice Be caref...

Страница 3: ...TY GROUND EARTH 6 BE SURE POWER AND AIR SUPPLY IS OFF BEFORE PERFORMING MACHINE MAINTENANCE PARTS REPLACEMENT ADJUSTMENTS OR CLEANING 7 DO NOT OPERATE MACHINE WITH GUARDS AND COVERS REMOVED 8 DO NOT T...

Страница 4: ...usting the machine or replacing parts Wear safety glasses Make sure before starting the machine that all covers and shields are in place and closed Do not touch on the machine when it is run Turn powe...

Страница 5: ...ht of Needle Bar 13 6 3 Fixing Loop Guide 13 6 Trouble Shooting 14 15 Parts List 17 Diagram of Screw Nut Washer 34 35 Numerical index of Parts 36 37 1 Specifications 2 2 The Points Before Operation 2...

Страница 6: ...rpm 5 000rpm Stitch range 5 0 9 5mm 4 0 9 0mm 3 6 8 0mm Seam Double thread chain stitch type 401 2 401 No of Needle 1 Needle 1 2 Needle 2 1 Needle 1 No of Thread 1 thread 2 2 thread 4 1 thread 2 Appli...

Страница 7: ...e correctly referring to the threading on the machine and the threading diagram Fig 1 2 3 Threading Fig 1 2 3 Fig Fig Needle Thread 1 1 Looper Thread 1 1 Needle Thread 1 1 Looper Thread 1 1 DKN 3 DKN...

Страница 8: ...upper G a Needle Bar Bushing lower H b Feed Bar Ass y L c Feed Crank Link Ass y M d Feed Lift Eccentric Ass y K d Looper Avoid Eccentric Ass y J Run the machine by hand to check that it turns smoothly...

Страница 9: ...e Setting Fig 5 Insert a new needle into needle bar as deep as it will go The concave part of needle should be faced to rear side of stitching direction Then tighten the needle bar nut C firmly to avo...

Страница 10: ...orward To adjust the position of the Looper Drive Rocker Shaft D first loosen the stud F of the Looper Drive Lever J and loosen the Screw H Slightly push or pull the Shaft to obtain the required timin...

Страница 11: ...Screw F and turn the Screw G as required Turning Screw G to the right will make the Looper go away from you and turning it to the left will make the Looper get nearer to you After the adjustment tigh...

Страница 12: ...travel loosen the nut E and turn the screw F to adjust the levelness of the feed dog Turning the screw to the left will make the leading edge of the feed dog raised and turning it to the right makes...

Страница 13: ...en the Screw C and move the Needle Guard B in the vertical direction Be careful that the Needle A slightly touch the Needle Guard B so that the clearance between A and B is 0 to 0 1mm After the adjust...

Страница 14: ...istance between its thread contact surface and the hole of the needle thread take up hole C is 5mm Check the size of the loop formed as the needle goes up and raise the needle thread take up wire B if...

Страница 15: ...machine correctly Reduce tension Adjust timing of needle and looper Tighten the screw Thread skips 1 Needle setting not correct Bent or damaged needle 2 Needle thread regulator set too low 3 Needle th...

Страница 16: ...12 1 2 3 4 5 6 1 2 3 1 2 3 4 1 2 3 4 5 6 1 2 1 2 3 7...

Страница 17: ...main parts 4 The last figure on the parts stamp number advances on each improvement of the parts 5 Parts No described in of Remarks means constitution of the assembly The parts list is subject to cha...

Страница 18: ...14 01 Cloth Cover Side Cover Parts 01...

Страница 19: ...Screw Cover cloth plate Spring Spring Washer Screw Screw Edge Guide Washer and nut Screw Holder needle guard Screw Needle Guard Screw Side Cover Screw Stud Face Plate lower Screw Open Plate Washer Sp...

Страница 20: ...16 02 Head Cover Oil Pump Parts 02...

Страница 21: ...775071 51295A 51295B Plate oil and baffle Screw Gasket Upper Cover Screw Screw Gasket Head Cover Felt Gasket Screw Block head oil tube mounting Lock washer Nut Clamp head oil tube Screw Pad Felt Oil...

Страница 22: ...18 03 Thread Tension Thread Guide Parts 02...

Страница 23: ...uide Base Screw Needle Thread Controller Screw Nut Washer Tension Post Support Screw Lead In Guide Tension Post Eyelet Tension Post Ferrule Tension Disc Tension Post Tension Spring looper thread Tensi...

Страница 24: ...20 04 Crank Shaft Main Shaft Parts 02...

Страница 25: ...using Screw O Ring O Bearing Holder Collar Ball Bearing 6302ZZ Bearing Holder Screw Ball Bearing 6202ZZ Oil Seal SC224211 Bearing Holder Collar B B O Ring O Counter Weight Screw Crank Shaft Main Shaft...

Страница 26: ...22 05 Needle Bar Needle Lever Parts 02...

Страница 27: ...eedle Bar Bushing lower Needle Bar Bushing upper Needle Thread Take Up Screw Needle Lever Ass y Needle Lever Needle Bar Connection Screw Screw Link Pin Oil Wick Retaining Ring Connecting Link Screw Ne...

Страница 28: ...24 06 Presser Foot Lifter Lever Parts 02...

Страница 29: ...Connection and Guide Screw Screw Guide Plate presser bar connection Screw Screw Presser Spring Nut presser spring regulator Presser Spring Regulator Lifter Lever Link Screw Bell Crank presser foot lif...

Страница 30: ...26 07 Looper Drive Connecting Rod Parts 02...

Страница 31: ...Screw Screw Screw Looper Rocker Ass y Looper Stud Looper Rocker Looper Rocker Cone Screw Nut Screw Nut Looper Screw Loop Guide Screw Oil Drip Plate Screw Ball Joint left Screw Nut left thread Nut Loop...

Страница 32: ...28 08 Feed Dog Feed Drive Parts 02...

Страница 33: ...w Feed Crank Link Ass y Feed Crank Link Ferrule Feed Crank Link Pin Oil Wick Washer Nut left thread Main Shaft Head Plate Scale Screw Feed Crank Stud Screw Screw Feed Crank Stud Insert X Ring X Retain...

Страница 34: ...180B 15 4 56190 21 32 56193A 17 26 56301 15 6 56313 27 20 56316 23 30 56316C 23 33 56322B 21 45 56322C 29 42 56334B 29 27 56334L 29 31 56334N 29 29 56335D 29 23 56335L 29 22 56336 29 14 56336B 29 6 56...

Страница 35: ...22585 17 16 22585A 15 43 22586R 23 26 22587K 21 28 22637P 24 29 35 22651CB 4 29 30 22651CD 4 29 26 22653L 8 21 26 22711 19 7 22758C 25 16 25 27 22760A 15 14 22764C 21 37 22798C 29 15 22801 29 46 22829...

Страница 36: ...32 DKN 3BP SCREW NUT WASHER...

Страница 37: ...33 DKN 3BP SCREW NUT WASHER...

Страница 38: ...MEMO...

Страница 39: ...MEMO...

Страница 40: ...NEWLONG INDUSTRIAL CO LTD 2007 06 06 URL E mail http nlwww com mail info nlwww com TEL03 3603 2284 FAX03 3603 2253 125 0063 4 8 14...

Отзывы: