TITAN 912L Actuator
INSTALLATION REFERENCE MANUAL
4
|
www.hysecurity.com Nice/HySecurity, 6705 S 209th St, Ste 101, Kent, WA 98032 - TF: 800-321-9947 MX4685 Rev. A ©2019
• DISCONNECT POWER AT THE CONTROL PANEL BEFORE MAKING ANY ELECTRIC SERVICE POWER
CONNECTIONS.
• BE AWARE OF ALL MOVING PARTS AND AVOID CLOSE PROXIMITY TO ANY PINCH POINTS.
Below is a list of tools necessary for installation of the Titan actuator:
• Welder (for pivot arm) unless optional bolt-on pivot arm (P/N 446) is used.
• Basic hand tools (screwdrivers, wrenches, pliers, etc..)
• Torx 25 tool (for removing actuator cover screws)
• Level (for ensuring pivot arm and actuator are level).
• Framing square (for determining pivot arm location)
• Torch/Chop Saw (for cutting pivot arm)
• Grinder (for sanding Pivot Arm)
•
Welder and associated tools (for afixing pivot arm to post)
IMPORTANT!
•
The gate operator installation is NOT a “do-it-yourself” project. Use a qualified gate operator installation
company to install this system to ensure a safe and reliable installation.
•
It is the responsibility of the property owner to ensure the installer is qualified to carry out the installation
in a safe and professional manner.
• Consult local government agencies for up-to-date rules and regulations to satisfy licensing, codes or
regulations that regulate automated gate system design and installation.
• The gate for which the gate operator is intended to be used should itself be installed correctly so that it
is level and plumb and the gate opens easily and evenly.
• Note that Nice swing gate systems are not intended for installation on an incline.
SECTION 2: INSTALLATION SAFETY
SECTION 3: TOOLS NEEDED FOR INSTALLATION
WARNING!
READ ALL SAFETY INFORMATION WHEN INSTALLING A SWING GATE SYSTEM! SEE EITHER
OF THE FOLLOWING MANUALS FOR SAFETY INFORMATION:
• CBOX936 Control Box Installation Manual (with 936 control board)
• CBOX1050 Control Box Installation Manual (with 1050 control board)