CONCRETE PAD MOUNT
Install the operator, by taking the following steps:
1.
Place the operator on the pad to best suit the
conduit as shown in Figure 2. Use the operator
as a template and center it on the pad. The
chain path must be parallel with the gate.
2.
Assess any limitations in the chain path such
as gate support posts. Adjust the operator’s
location as required. Mark the mounting
locations based on gate, operator, and chain
requirements. Mark the drill point at the center
of the slot to allow for adjustments. See Figure
3 and Figure 10.
3.
Remove the operator from the concrete pad
and drill the holes for the concrete anchors.
See Tip.
4.
Mount the operator with four ½ - 13 x 3½-inch
concrete anchors as shown in Figure 9.
5.
For additional types of mounting options, refer
to the Appendix.
INSTALLATION
Figure 10. Concrete Pad Dimensions and Overhead Gate View
19" minimum
(48.3cm)
Conduit
Cut Out
Gate
Chain,
#40 Roller
Mark the center of
ƐůŽƩĞĚŚŽůĞƐ;ϰdžͿĨŽƌ
concrete anchors:
ЪͲϭϯdžϯЪΗ
21"
(53.3cm)
10
.
5"
(26.7cm)
1.6"
(4.1cm)
6.4"
(16.3cm)
10.4"
(26.4cm)
Concrete
ƉĂĚ
Chain to Gate
/ĚĞĂůĚŝƐƚĂŶĐĞсϯвΗ;ϵ͘ϱĐŵͿ
DŝŶ͘ĚŝƐƚĂŶĐĞсϮЪΗ;ϲ͘ϰĐŵͿ
PUBLIC
SECURE
ŝƌĞĐƟŽŶŽĨŐĂƚĞ
movement when
ŽƉĞŶŝŶŐ
Gate
Suppot
Posts
^ůŝĚĞ^ŵĂƌƚ,
Gate Suppot
Posts
ŚĂŝŶƌĞƐŝĚĞƐŝŶƐŝĚĞ
ŐĂƚĞƐƵƉƉŽƌƚƉŽƐƚƐ
ƉĂƌĂůůĞůǁŝƚŚƚŚĞŐĂƚĞ͘
>ĞŌŚĂŶĚŐĂƚĞ
(shown in full CLOSE
ƉŽƐŝƟŽŶͿ
Figure 9. Concrete Anchors
TIP:
To keep pinpoint accuracy while drilling the
mounting holes in the concrete, use a 3/16-inch
bit to pilot the holes and then move to a ½-inch
drill bit.
Concrete
base
½ - 13 x 3½"
concrete
anchors (x4)
Grade
level
Concrete
pad
MX4505 Rev. E ©2020
22