www.nextups.eu
11
E
n
g
lish
Step 2:
With one person on each side, carefully lift the cabinet out of the
outer carton using the handles on the cardboard and set it on a flat,
stable surface (see Figure 3-3&3-4).
Place the cabinet in a protected area that has adequate airflow and
is free of humidity, flammable gas, and corrosion.
Lifting the Cabinet:
Figure 3-3: Lifting the Cabinet out of
LOGIX II 6000
UPS carton
CAUTION:
The cabinet is heavy. Lifting the cabinet out of the carton required
two persons at least.
Содержание LOGIX II RT NETPACK 10000VA
Страница 1: ...NEXT UPS Systems LOGIX II RT 6000 10000 NETPACK Installation and user manual English...
Страница 4: ......
Страница 31: ...www nextups eu 27 English Figure 4 5 a Parallel systerm wiring diagram of LOGIX II 6000 1000...
Страница 32: ...www nextups eu 28 English Figure 4 5 b Parallel System Installation Diagram...
Страница 43: ...www nextups eu 39 English...