www.nextups.eu
9
E
n
g
lish
3. Installation
This chapter explains:
Equipment inspection
Unpacking the cabinet
Checking the Accessory
UPS setup and installation
Connecting the internal battery
Connecting the
EXB
(Extended Battery)
Installation requirements
3.1 Inspecting the Equipment
If any equipment has been damaged during shipment, keep the
shipping cartons and packing materials for the carrier or place of
purchase and file a claim for shipping damage. If you discover
damage after acceptance, file a claim for concealed damage.
Note:
Check the battery recharge date on the shipping carton label.
If the date has passed and the batteries were never recharged, do
not use the UPS. Contact your service representative.
3.2 Unpacking the carton
CAUTION:
If the carton unpacks in a low-temperature of
environment it may cause condensation of moisture in or on the
cabinet of UPS. Do not install the UPS until the inside and outside of
the cabinet is absolutely dry to prevent hazard of electric shock.
CAUTION:
The cabinet is heavy. Refer following instruction to
unpack and move the cabinet from packing carton.
Be careful when moving and opening the carton. The unpacking
steps are shown as below:
Содержание LOGIX II RT NETPACK 10000VA
Страница 1: ...NEXT UPS Systems LOGIX II RT 6000 10000 NETPACK Installation and user manual English...
Страница 4: ......
Страница 31: ...www nextups eu 27 English Figure 4 5 a Parallel systerm wiring diagram of LOGIX II 6000 1000...
Страница 32: ...www nextups eu 28 English Figure 4 5 b Parallel System Installation Diagram...
Страница 43: ...www nextups eu 39 English...