www.nextups.eu
42
E
n
g
lish
Figure. 5-16 Measurement menu tree
5.4.5 The control menu
By pressing
on the menu of “Control”, the display would enter
the next control menu tree.
1) Start Battery Test: this is one command that control the UPS to
do the battery test.
2) Clear EPO status: once EPO status is enabled, the UPS output
would be cut off. To recover to normal status, first EPO
connector should be closed, and enter this menu to clear EPO
status, then UPS would stop alarm and recover to Bypass
model. And UPS needs be turned on by manual operation.
3) Reset Fault status: when fault occurs, UPS would keep in Fault
Содержание LOGIX II RT NETPACK 10000VA
Страница 1: ...NEXT UPS Systems LOGIX II RT 6000 10000 NETPACK Installation and user manual English...
Страница 4: ......
Страница 31: ...www nextups eu 27 English Figure 4 5 a Parallel systerm wiring diagram of LOGIX II 6000 1000...
Страница 32: ...www nextups eu 28 English Figure 4 5 b Parallel System Installation Diagram...
Страница 43: ...www nextups eu 39 English...