9/24 - Installation instructions for the BANC D.sign above water automatic slatted safety cover
9
3.2 Preparing the fixtures
Fig. 16A and 16B
Pass the cables from the technical room through the
provided opening. Position the bench and mark the
4 fixing hole positions. Trace, move the bench aside
and drill 10 mm diameter holes penetrating the
concrete belt by 100 to 120 mm.
Fig. 16A
Fig. 16B
3.3 Placing the studs
Fig. 17
Hammer the M10 pins using a mallet until they
protrude from the cover by 15 mm.
15 mm
Fig. 17
4. Electric connections
Have the electric connections made by a qualified
technician in compliance with current standards.
Fix the transformer box in the technical room.
4.1 Box
Fig. 18 REFER TO THE ATTACHED WIRING DIAGRAMS
4.1.1 Connect the 230 V power supply cable in the electric
box to the terminal marked "T" for the earth, "P"
for the phase and "N" for the neutral.
4.1.2 Connect the 2 power wires on the connecting cable
to the terminals marked "+" and "-".
O/F (Open)
2 x 1.5 mm²
Hard wired
remote switch
option
12/24 V
DC motor
2 x 6 mm²
Slow mode
2 x 1.5 mm²
230 V AC
3 x 2.5 mm²
Fig. 18
4.1.3 Connect the cable from the treatment control box
to terminals (NF) and (C) or (NO) and (C) depending
on the appliance contact type.
4.2 Motor and key switch
REFER TO THE ATTACHED WIRING DIAGRAMS.
4.2.1 Connect the power wires in the bench junction box
to the dominoes marked "+" and "-", making sure to
comply with the polarity.
4.2.2 Connect the motor cable wires (blue, brown, black
and red) to the screw terminals numbered 1, 2, 3
and 4.
4.2.3 Connect the open/close cable (2 x 1.5 mm²) for
treatment coupling to screw terminals 1 and 2.