5/24 - Installation instructions for the BANC D.sign above water automatic slatted safety cover
5
1.3 Squaring checks
Fig. 5
1.3.1 In order to correctly place your roller perpendicular
to the pool lengths: measure the diagonals.
1.3.2 Make a mark (1) on the pool liner at the level of the
edge opposite the cable exit.
1.3.3 Measure a precise length "A" of 1 m less than the
length of the pool and make a mark (2), at the end
of A on the pool liner.
1.3.4 On the opposite length make a mark (3) opposite
mark (1).
Important, items 1 and 3, while complying with
squaring, must be located as close as possible
to being plumb with the rear coping edges for
right angles, or the end of any eventual radius.
1.3.5 Carry over the "A" measurement from (3) in order
to place mark (4).
1.3.6 Measure the distance "B1" between (1) and (4).
1.3.7 Measure the distance "B2" between (2) and (3).
1.3.8 If the B1 and B2 measurements are equal, continue
with the next step, otherwise correct the position
of markers (3) and (4) and start the operation again
until B1 = B2.
4
3
1
2
A
A
B1
B2
L
l
Fig. 5
1.2 Building work
1.2.1
Concrete belt
Fig. 3
Create a 0.1 m
3
concrete block dosed at 350 kg/ m
3
,
1 m long, 0.25 m wide and 0.4 m high to stabilise the
roller fixing.
100 cm
25 cm
40 cm
25 cm
100
cm
40 cm
Fig. 3
1.2.2
Overflow
Fig. 4
Plan to control the water level at between -10 cm
and -15 cm below the levelling course using a
ø 50 mm overflow which is independent of the
skimmers, and automatic filling. The absence of
an operational level control compliant with our
recommendations will void our guarantee.
Fig. 4
120 mm
Ø 50 mm
120 cm
Ø 50
mm
1.2.3
Skimmer
When possible, plan to place the skimmers on the
pool widths and not on the lengths in order to
facilitate the movement of the cover.