7/24 - Installation instructions for the BANC D.sign above water automatic slatted safety cover
7
2. Delivery and Reception
2.1 Delivery
Fig. 10
2.1.1 Plan the presence of 2 to 6 persons, or use a handling
device to handle the cover. The cover is delivered in
a non-recoverable wooden container measuring at
least 40 cm more than the width of the pool. It is
heavy and fragile.
2.1.2 For a 4 x 8 pool, the container weighs 410 kg and
measures 4.6 x 0.6 x 0.8(h).
Fig. 10
W
4.2 4.7 5.2 6.2 7.2 8.2 9.2 10.2 11.2 12.2
X
4.6 5.1 5.6 6.6 7.6 8.6 9.6 10.6 11.6 12.6
0.8 m
x
0.6 m
0.8 m
0.6 m
2.1.3 For a 5 x 10 pool, the container weighs 560 kg and
measures 5.6 x 0.6 x 0.8(h).
2.2 Reception
2.2.1 Open the container in the presence of the delivery
staff and check the condition of the goods and their
compliance. Keep the original packing.
2.2.2 If there is any damage or missing parts, write down
your reserves on the transport documents (e.g.:
burst pack). The words "subject to unpacking" alone
are null and void. Send a registered letter (with
acknowledgement of receipt) to the transporter
within 2 days. This letter must accurately detail the
damage found. Send a copy of the letter to AS POOL
for information.
2.2.3 Store the parts in the container which should not
be left in full sunlight, but should be placed in a cool
place if the assembly is not carried out on the same
day.
2.2.4 Make the inventory compared to the order.
2.2.5 Read the instructions completely before starting
the assembly.
2.2.6 The installation requires 2 people for 4 hours.
x 2
4:00
2.3 Necessary tools
Fig. 11
Plan the equipment necessary for the assembly: a
perforator, a set of flat spanners, socket wrenches and
hex keys, a set of screwdrivers, a mallet, pliers, a level,
a glue gun, a cutter, a multimeter, a tape measure, a
grinder, a marker and a saw.
Fig. 11
2.4 Crate content:
-
A slatted cover.
-
A Banc D.SIGN assembled with its roller shaft.
-
A 19 x 25 cm box
-
A fixture kit.
-
Installation instructions.